top of page

FAQ & TOOLS

How long will it take to get my building delivered after I place an order?
Delivery times vary depending on your area, although it is generally 2-8 weeks from the time your order is received. To inquire about specific delivery times in your area, contact our office and speak with a building specialist.

What size do I need to pour my cement slab?
You should pour your cement exact to width and 1’ shorter in length. In Florida, the cement should be ¾” wider than the width and 1’ shorter in length. For example: In all states except Florida, the slab for a 18’ x 21’ x 6’ unit needs to be 18’ x 20’. In Florida, the slab for the same unit needs to be 18’ ¾” x 20’.

What are the dimensions of the building, outside to outside?
Our building measurements are width x length x height. For example: An 18’ x 21’ x 6’ building’s base frame size is 18’ x 20’ x 6’. Note that the measurements stated are the dimensions of the roof metal. It has a 6” overhang on each end so the bottom base rail frame is one foot shorter than the roof. The width is measured from the outside of the baserail to to the other outside of the baserail.

Does my installation site need to be level?
To insure proper installation, your site must be level.